Pre-Wire, Application of the system design is implemented via the pre-wire. This step in the installation is completed before the product installation. Note: The System Design should be completed well before electrical phase of construction begins to eliminate any delay in the pre-wire phase. Post construction technique's are use and precautions taken to ensure customer satisfaction of a clean tidy installation on homes that are occupied.
|
Trim Out, This step consist of installation of selected products. Wiring completed all connections are terminated and wire management practices implemented to eliminate disorganization. System programing and integration completes the trim out phase of the installation. |